The building is a hotel apartment building with a total  foot print of 3000 m2. The building consistS of two basements, ground + twelve floors.Slabs are mainly post tensioned concrete slabs. The scope of work was to design all floors as post tensioned slabs taking  temperature effect as well as seismic loads into consideration and preparing design drawings,shop drawings and calculation sheets.

PALM1.png
CR_PalmJumeirahHotel02 27March17.jpg

Codes and Standards:

ASCE07-: Minimum Design Loads for Buildings and other Structures.

Building Code Requirements for Structural Con-crete (ACI 02-318) and commentary.

​

Software:

ETABS 2016

Ram 6.2

Autocad

Client:

NIWA REAL ESTATE L.L.C.

Consultant:

ARIF AND BINTOAK

Main Contractor :

AL GHURAIR CEW

​

​