top of page

The building is a mixed use tower with a foot print of 3000 m2. The building consists of 4 basements, ground and 42 floors.Slabs are mainly post tensioned concrete slabs. The scope of work was to design all floors as post tensioned slabs taking  temperature effect as well as seismic loads into consideration and preparing design drawings,shop drawings and calculation sheets.

Codes and Standards:

ASCE07-: Minimum Design Loads for Buildings and other Structures.

Building Code Requirements for Structural Con-crete (ACI 02-318) and commentary.

​

Software:

ETABS 2016

Ram 6.2

Autocad

Client:

MBL Investements L.L.C. FZ

Consultant:

National Engineering Bureau

Main Contractor :

Ali Mousa and Sons Contracting.

​

​

GET IN TOUCH:

CONTACT US:

Mob: 002 01021745593 EGY

Mob: 971 506675342     UAE

Email: info@lead-eg.com

JASMINE TOWER (1) MARYOUTTEYA

PYRAMIDES-GIZA-EGYPT

Success! Message received.

bottom of page